Latest newsletter/9 October 2026

Contamination conditions discharged

Open for comment/closing soonest first

Applications you can still comment on

  1. MC/26/1809Comment by 14 October 2026Object

    Condition 13: the Town Road signage

Cliffe/Cliffe Woods

What is being built around Cliffe and Cliffe Woods

Two villages, 24 entries and a planning process that moves in references and deadlines. Eleven decisions sit with Medway right now, all of them on Church Street, where the principle is settled and only the detail is still open. This page holds the whole picture and how to write an objection that actually counts.

Live applications
11decisions Medway has to take now
Cliffe Marshes
~450 mnorth of the site, on the applicant’s own Drainage Technical Note
Homes consented
574permission granted or under construction
Register checked
9 October 2026built from the group’s own filed evidence

The newsletter

The whole thing, caught up in ten minutes

Written for people who do not follow planning and should not have to. Every issue is the same: what actually happened, what it means and what is worth doing about it. Free to read, free to forward, no sign-up.

9 October 2026/4 pages

Contamination conditions discharged

The issue of 9 October. Medway discharged the four contamination conditions on the Church Street land on 8 October, for the whole site, accepting the investigation the applicant filed. The specialist response the decision letter relies on is not on the public file. Objections on the six applications that closed in early October rose from forty-five to seventy-three. Four pages, with the one closing date still to come, 14 October for MC/26/1809.

Read the latest issue (opens in a new tab)

Past issues

  • Six closed, one still open (opens in a new tab)2 October 2026/5 pagesThe issue of 2 October. The six applications validated on 7 and 8 September closed on 1 and 2 October with forty-five objections between them on Medway’s file. None has been decided. The parish council’s response on the travel plan is on the file. Comments on the replacement recreation ground now number twenty-seven. Medway refused three homes at Westfield, Town Road, on 24 September. Five pages, with the one closing date still to come, 14 October for MC/26/1809.
  • One closed, a seventh arrives (opens in a new tab)25 September 2026/6 pagesThe issue of 25 September. Comments on the replacement recreation ground closed on 24 September with twenty-two objections on Medway’s file, eleven of them filed in the last week. A seventh application on the Church Street land, MC/26/1809, was validated on 21 September and closes on 14 October. Medway discharged a condition at Buckland Road on 22 September. Six pages, with the six closing dates of 1 and 2 October.
  • One approved, eleven still waiting (opens in a new tab)18 September 2026/6 pagesThe issue of 18 September. Medway discharged condition 32, the drainage scheme, on 15 September without referring to any of the twelve objections on the file and the committee has asked it to look again. Medway’s consultation on the remediation scheme ended on 16 September. The group’s objections of 9 September to five of the September applications are not yet on Medway’s public file. Six pages, with the four closing dates still to come: 24 September for the recreation ground, then 1 and 2 October.
  • Six applications, six objections (opens in a new tab)11 September 2026/5 pagesThe issue of 11 September. There were six new applications on the Church Street site that week, not five. The sixth is the travel plan, marked as a draft. The group objected to it on 11 September, so all six carry an objection. All six close on 1 or 2 October. Five pages on what the travel plan leaves out, the Higham Road refusal notice and four dates to watch before those deadlines.
  • Five more applications, one with nothing in it (opens in a new tab)9 September 2026/6 pagesIn two days Medway took in five more applications on the Church Street site. The group has read all of them, objected to all of them and found one that has nothing to read at all. Six pages in plain English: what each application asks for, what is wrong with the paperwork and the one thing worth knowing above all others — that nothing can lawfully start on that land yet, because the condition covering site clearance has never even been applied for.
  • Our website, two weeks in (opens in a new tab)4 September 2026/6 pagesWhat changed on the site in its first fortnight, who read it and what that tells the group about when to post. The finding that matters: people read it when they can still change something. 294 visits the day before the Higham Road committee, 87 a day thereafter with nothing new added.

The register

Every scheme in the parish, in one list

Sorted so that anything still open for comment sits at the top. Entries marked needs confirming came from press coverage or the parish council’s tracker and have not yet been checked against the council’s own file — check before you quote them.

Reserved matters: the 250-home phase, Church Street, Cliffe

Awaiting a decision
Homes 250-home phaseDeveloper Esquire Developments

Detailed approval for the housing phase. Condition 1 as amended requires reserved matters approval for each phase or sub-phase, highway works excepted, before any development takes place. This is not a paperwork exercise: it is the decision by which the housing phase becomes capable of proceeding. A supplementary objection on the adequacy of the health evidence was filed on 9 September 2026: the Health Impact Assessment relied on four Highparks Medical Practice sites and the Higham branch has since closed and the group asks Medway to say whether the environmental information before it remains adequate. On 18 September 2026 the committee wrote again, on the affordable housing. The section 106 agreement of 2 June 2023 requires the affordable homes to be 60 per cent affordable rented housing and 40 per cent shared ownership. The planning statement filed with this application says 25 per cent of the homes will be affordable, split 60 per cent affordable rent and 40 per cent social rent. It puts the number of affordable homes at 63. The letter asks Medway four questions about which tenure mix it understands the agreement to require and which is now proposed. Medway’s document list labels it an objection; the letter says in terms that it is a request for clarification, not a representation.

  • Layout, scale, appearance and landscaping of 250 homes
  • Whether the affordable homes are the tenures the section 106 agreement secures

Consultation ended 8 September 2026 — still undecided

View MC/26/1465 on the portal (opens in a new tab)Open its own page: Reserved matters: the 250-home phase Read the group’s objection on MC/26/1465 (opens in a new tab)Checked 2026-10-09

Reserved matters: mixed-use community hub, Church Street, Cliffe

Awaiting a decision
Homes hub phaseDeveloper Esquire Developments

Detailed approval for the community hub phase, under the same condition 1 requirement as the housing. A supplementary objection on the adequacy of the health evidence was filed on 9 September 2026: the Health Impact Assessment relied on four Highparks Medical Practice sites and the Higham branch has since closed and the group asks Medway to say whether the environmental information before it remains adequate.

  • What the promised community hub actually turns out to be

Consultation ended 8 September 2026 — still undecided

View MC/26/1466 on the portal (opens in a new tab)Open its own page: Reserved matters: mixed-use community hub Read the group’s objection on MC/26/1466 (opens in a new tab)Checked 2026-10-09

Reserved matters: sports ground and pavilion, Church Street, Cliffe

Awaiting a decision
Homes sports phaseDeveloper Esquire Developments

Detailed approval for the replacement sports ground and pavilion. It also fixes the layout to which conditions 40 and 41 attach — which makes it the application that decides what the village actually gets in place of the APCM recreation ground. A supplementary objection on the adequacy of the health evidence was filed on 9 September 2026: the Health Impact Assessment relied on four Highparks Medical Practice sites and the Higham branch has since closed and the group asks Medway to say whether the environmental information before it remains adequate.

  • The replacement for the APCM Cliffe Recreation Ground
  • Access to and suitability of the relocated sports ground

Consultation ended 8 September 2026 — still undecided

View MC/26/1467 on the portal (opens in a new tab)Open its own page: Reserved matters: sports ground and pavilion Read the group’s objection on MC/26/1467 (opens in a new tab)Checked 2026-10-09

Condition 41: the pitches, courts and pavilion, Church Street, Cliffe

Awaiting a decision
Homes the replacement recDeveloper Esquire Developments

Received and validated on 28 August 2026. It asks Medway to approve the design and layout of the pitches, courts and pavilion under condition 41 of the appeal decision — which is to say, the thing the village is to receive in place of the APCM recreation ground. The applicant has filed two documents: an application form and a single site plan. By 11 September the parish council’s statutory response was on the file. Medway’s consultation period ran from 3 September to 24 September 2026, Medway’s register recorded twenty-two comments on it on 25 September 2026 and twenty-seven on 2 October 2026, all of them objections. Medway had not decided it as at 9 October 2026, when the count still stood at twenty-seven; its own target date is 23 October 2026. It runs alongside MC/26/1467, the reserved matters for the same phase, which Medway has not yet determined, so the detail of the replacement ground and the layout those details depend on are before the council at the same time. The group objected on 7 September 2026. Paragraph 25 of the appeal decision records the replacement as two football pitches, a cricket pitch, three tennis courts, three cricket nets and a new pavilion housing two changing rooms, going over and above the existing facilities. The applicant’s own planning statement, filed on MC/26/1467, offers one adult and one youth football pitch, two hard tennis courts and one cricket pitch, with no nets. The pavilion drawing exists, on MC/26/1467, but forms no part of this application.

  • Three tennis courts and three cricket nets, or two courts and none
  • A pavilion whose design is not in the application at all
  • Pitch dimensions, run-offs and ball-stop, settled on one undimensioned drawing
  • The mitigation the 2023 appeal decision relied on

Consultation ended 24 September 2026 — still undecided

View MC/26/1646 on the portal (opens in a new tab)Open its own page: Condition 41: the pitches, courts and pavilion Read the group’s objection on MC/26/1646 (opens in a new tab)Checked 2026-10-09

Condition 15: the travel plan, Church Street, Cliffe

Awaiting a decision
Homes pre-occupationDeveloper Esquire Developments

Received and validated on 7 September 2026, alongside MC/26/1720 to MC/26/1724, with an internal target date of 2 November. It asks Medway to approve the travel plan required by condition 15 of the appeal decision, in full and for the whole development. Two documents are on the council’s file: the application form and a 26-page travel plan by the consultancy DHA, marked ‘Draft’ on its cover and watermarked DRAFT across its pages. Condition 15 asks for a final plan before each phase is occupied. This one names no phase, counts all 250 homes as one and says nothing about the community hub or the sports ground. It also drops commitments made in the 2022 Framework Travel Plan, among them a steering group with residents on it, personal travel advice for every household and independent monitoring. The group found this application on 11 September and filed its objection the same day. Medway’s consultation period closed on 2 October 2026. On 9 October 2026 its register recorded twelve comments, all of them objections. It had not decided the application, so a comment can still count; its own target date is 2 November 2026.

  • How people will get to and from the new homes, the hub and the sports ground
  • Whether a document marked ‘Draft’ is what Medway is being asked to approve
  • Whether the promises in the 2022 Framework Travel Plan survive into the final one

Consultation ended 2 October 2026 — still undecided

View MC/26/1719 on the portal (opens in a new tab)Open its own page: Condition 15: the travel plan Read the group’s objection on MC/26/1719 (opens in a new tab)Checked 2026-10-09

Condition 54: air quality emissions mitigation, Church Street, Cliffe

Awaiting a decision
Homes pre-commencementDeveloper Esquire Developments

Received 7 September 2026, validated 8 September. Condition 54, as amended, bars development in any phase or sub-phase, highway works excepted, until an Air Quality Emissions Mitigation Statement has been approved. The condition requires that Statement to be prepared in accordance with Medway’s own Air Quality Planning Guidance and that guidance says the latest Defra source sector damage costs should always be used. The Statement filed performs no calculation at all. It carries across a figure of £66,702 from the Environmental Statement of January 2022, since when Defra has updated its values twice. Against it the applicant sets £350,000 of mitigation, of which half is one electric vehicle charge point per dwelling — something Part S of the Building Regulations has required for new homes with parking since June 2022. The arithmetic does not work either: at the stated £750 a unit, £175,000 buys 233 units, not 250. The group filed its objection on 9 September 2026. Medway’s consultation period closed on 2 October 2026. On 9 October 2026 its register recorded eleven comments, all of them objections. It had not decided the application, so a comment can still count; its own target date is 3 November 2026.

  • Whether the cost of the harm is calculated on current figures or on 2022 ones
  • Whether the Building Regulations can be counted as mitigation
  • Air quality on the lanes of a village ringed by internationally designated marshland

Consultation ended 2 October 2026 — still undecided

View MC/26/1720 on the portal (opens in a new tab)Open its own page: Condition 54: air quality emissions mitigation Read the group’s objection on MC/26/1720 (opens in a new tab)Checked 2026-10-09

Condition 10: the Cooling Road highway works, Church Street, Cliffe

Awaiting a decision
Homes documents published lateDeveloper Esquire Developments

Received and validated on 7 September 2026, with an internal target date of 2 November. On 9 September its documents tab was empty: no application form, no covering letter, no drawing, while the companion applications validated the same day and the next all had documents. By 11 September an application form and four drawings had been published, each dated 7 September. The application form lists all four as Station Road drawings. Condition 10 requires the details of the ‘Cooling Road improvements’ shown on drawing ITB11092-GA-018 Rev A to be approved before any development takes place, but the appeal decision’s own list of approved plans titles that drawing ‘Proposed improvement scheme on Station Road’. The non-material amendment of May 2024 quietly changed the implementation trigger from ‘before any part of the development’ to ‘before that phase’. The group filed a holding objection on 9 September, when there was nothing to read. It reserved the right to say more once the documents appeared. It has not yet assessed the drawings. Medway’s consultation period closed on 2 October 2026. On 9 October 2026 its register recorded eleven comments, all of them objections. It had not decided the application, so a comment can still count; its own target date is 2 November 2026.

  • Whether residents can see what has been submitted before it is decided
  • Traffic through the village on Cooling Road
  • Whether the details are the works the condition actually names

Consultation ended 2 October 2026 — still undecided

View MC/26/1721 on the portal (opens in a new tab)Open its own page: Condition 10: the Cooling Road highway works Read the group’s objection on MC/26/1721 (opens in a new tab)Checked 2026-10-09

Condition 11: the access into the new sports ground, Buttway Lane, Cliffe

Awaiting a decision
Homes one of four worksDeveloper Esquire Developments

Received and validated on 8 September 2026. Condition 11 names four highway works: the sports pitch access at Buttway Lane, two site accesses on Church Street and one on Cooling Road. Details have been filed for one of them. The application form answers ‘No’ to the question whether only part of a condition is being discharged, so Medway is being asked to discharge the whole condition on a quarter of what it requires. Two of the four drawings state on their face that the junction is tracked for a refuse vehicle, a van and a large car and that coach access would need different radii — this being the only way into the ground that replaces the rec. The drawings offer the highway drainage for adoption by Kent County Council, which has had no highway function in Medway since 1998 and the word ‘Medway’ appears on none of them. The site clearance drawing proposes felling trees and moving a pole with no tree survey and no electricity apparatus plotted. The group filed its objection on 9 September 2026. Medway’s consultation period closed on 1 October 2026. On 9 October 2026 its register recorded sixteen comments, all of them objections. It had not decided the application, so a comment can still count; its own target date is 3 November 2026.

  • Whether a coach or a minibus can reach the new sports ground
  • Trees felled with no survey and a pole moved with no wayleave
  • The first thing to be built on this site, fixed before anyone knows what the ground is

Consultation ended 1 October 2026 — still undecided

View MC/26/1722 on the portal (opens in a new tab)Open its own page: Condition 11: the access into the new sports ground Read the group’s objection on MC/26/1722 (opens in a new tab)Checked 2026-10-09

Condition 12: the Cooling Road improvements, Cooling Road, Cliffe

Awaiting a decision
Homes pre-commencementDeveloper Esquire Developments

Received and validated on 7 September 2026. Medway’s register advertises this as details of highway works to ‘town roads’, but condition 12 is about Cooling Road improvements on the eastern parcel and all four drawings filed with it are titled ‘Cooling Road — Eastern Parcel’. Condition 12 names one drawing, ITB11092-GA-022. The four drawings submitted are 5997-003-6004, 6014, 6024 and 6034. The reference ITB11092 appears on none of them. The general arrangement drawing offers the highway drainage for adoption by Kent County Council, which has had no highway function in Medway since 1998 and the connection point is marked ‘to be confirmed’. One of the four is a site clearance drawing, filed with no tree survey and no arboricultural information of any kind. The group filed its objection on 9 September 2026. Medway’s consultation period closed on 1 October 2026. On 9 October 2026 its register recorded twelve comments, all of them objections. It had not decided the application, so a comment can still count; its own target date is 2 November 2026.

  • An application advertised under a description that matches neither the condition nor the drawings
  • Trees cleared on Cooling Road with nothing filed to assess
  • Who maintains the highway drainage, on a drawing that names the wrong council

Consultation ended 1 October 2026 — still undecided

View MC/26/1723 on the portal (opens in a new tab)Open its own page: Condition 12: the Cooling Road improvements Read the group’s objection on MC/26/1723 (opens in a new tab)Checked 2026-10-09

Condition 26: the noise assessment, Church Street, Cliffe

Awaiting a decision
Homes pre-commencementDeveloper Esquire Developments

Received 7 September 2026, validated 8 September. Condition 26 requires an acoustic assessment in accordance with BS8233:2014 before each residential phase. A survey was carried out: three Class 1 meters, calibrated in the field, with a witnessed log and audio recording and the group says so plainly. The difficulty is the report. Its two tables date the survey to a period ending on 2 June 2056; the data plotted in its own appendix stop on 31 May 2026. The section describing the weather still reads ‘Temperatures ranged from X – Y °C’ and sends the reader to an appendix that holds no weather data. The only calibrator identified was laboratory-calibrated a month after the survey. No model was built for the maximum night-time levels the condition expressly limits. And the report recommends discharging conditions 27 and 28, which nobody has applied for, while elsewhere saying they should not yet be discharged — inviting Medway to accept a noise limit 10 dB above the one the Inspector imposed. The group filed its objection on 9 September 2026. Medway’s consultation period closed on 2 October 2026. On 9 October 2026 its register recorded eleven comments, all of them objections. It had not decided the application, so a comment can still count; its own target date is 3 November 2026.

  • Whether new homes are protected from road noise and on what evidence
  • A limit on the community hub that the report asks Medway to relax
  • Whether a report that cannot be checked can discharge a condition on EIA development

Consultation ended 2 October 2026 — still undecided

View MC/26/1724 on the portal (opens in a new tab)Open its own page: Condition 26: the noise assessment Read the group’s objection on MC/26/1724 (opens in a new tab)Checked 2026-10-09

Condition 13: the Town Road signage, Town Road, Cliffe Woods

Open for comment
Homes pre-commencementDeveloper Esquire Developments

Received and validated on 21 September 2026. Condition 13 requires the details of the highway works on the B2000, as shown on drawings ITB11092-GA-023 and ITB11092-GA-024, to be approved before any development takes place, with the works carried out before the 50th dwelling is occupied. What has been filed is an application form and two signage drawings by Robert West Consulting, dated 26 August 2026. Neither carries the ITB11092 reference the condition names. The two sheets are different drawings, covering different ground at different scales, yet both print the same number in the title block, 6051 at revision A01, under the register reference 5997-003. The application form gives them two different numbers, 5997-003-6051 for Town Road South and 5997-003-6052 for Town Road North. The file properties of the two published drawings bear out the form: the Town Road North sheet was plotted from a file named 6052, the Town Road South sheet from one named 6051. Both drawings are therefore on the file. What is wrong is that the North sheet prints 6051 on its face, so no sheet before the council prints the number 6052 at all. The form also lists a covering letter among the items submitted, which Medway had not published as at 9 October 2026. Both sheets name the project as Church Road, Cliffe; the site is Land to the east and west of Church Street. What each sheet shows is a location plan annotated with photographs of existing signs and road markings. Neither carries a sign schedule, a Traffic Signs Regulations diagram number or a single dimension for any sign proposed. Comment by 14 October 2026, when Medway’s consultation period ends. Medway’s own target date is 16 November 2026.

  • Signage on the B2000, the main road through Cliffe and Cliffe Woods
  • Two different drawings filed under one drawing number
  • A pre-commencement condition on the permission for up to 250 dwellings
  • Signs shown as photographs, with no schedule, diagram number or dimension

Comment by 14 October 2026

Comment on MC/26/1809 (opens in a new tab)Open its own page: Condition 13: the Town Road signage Checked 2026-10-09

Oakleigh Fields, land off Town Road, Cliffe Woods

Being built
Homes 187Developer Gladman (permission) — built out by Redrow

Outline permission for up to 225 dwellings. Refused by Medway in May 2017 under MC/16/3669. Gladman appealed. After a public inquiry the Inspector recommended the appeal be allowed — but the Secretary of State recovered the appeal, disagreed with his own Inspector and on 8 November 2018 dismissed it and refused permission (APP/A2280/W/17/3175461). These homes did not arrive by appeal: that objection succeeded. Gladman applied again under MC/19/0287 and it was Medway itself that granted outline permission, on 24 February 2021. Objections turned on school places, GP capacity, transport and the loss of agricultural land. The Inspector put the site at around 11 hectares, of which 2.6 hectares was best and most versatile and found that loss not significant enough to be determining. Detailed approval followed in February 2022 for 184 of the 225 homes (MC/21/1287) and a variation in October 2025 (MC/25/1559) brought that to 187. Now being built.

  • Around 11 hectares of farmland, 2.6 of it best and most versatile
  • School places and GP capacity across both villages
View MC/19/0287 on the portal (opens in a new tab)Open its own page: Oakleigh Fields, land off Town Road Checked 2026-10-09

Land south of View Road — 68 homes, Cliffe Woods

Being built
Homes 68Developer Esquire Developments

Sixty-eight dwellings including affordable housing, with parking, landscaping, open space, drainage and earthworks and a new access formed from View Road. Permission granted and being built out — conditions on biodiversity net gain and play equipment were discharged through 2025.

  • Construction traffic routed through Town Road
View MC/21/1694 on the portal (opens in a new tab)Open its own page: Land south of View Road — 68 homes Checked 2026-10-09

Land at Town Road — the Oakleigh Fields build-out, Cliffe Woods

Being built
Homes counted under Oakleigh FieldsDeveloper Redrow

The parish council’s tracker lists a Town Road scheme separately from Oakleigh Fields. The council’s own file shows they are the same thing: MC/21/1287 is the reserved matters approval under MC/19/0287, the 225-dwelling outline permission, at Land at Town Road. That approval, in February 2022, was for 184 homes. Later variations changed the landscaping (a pond replaced with a small orchard) and reconfigured the affordable homes without adding any. A third, MC/25/1559, approved on 28 October 2025, added three market homes, taking the number approved in detail to 187; its conditions on electric vehicle charging and ecology were discharged under MC/26/1086 on 29 July 2026. Listed here so the two names are not mistaken for two developments. The register counts the site once, under Oakleigh Fields, at the 187 homes approved in detail.

  • Frontage onto the recreation ground
View MC/21/1287 on the portal (opens in a new tab)Open its own page: Land at Town Road — the Oakleigh Fields build-out Checked 2026-10-09

Condition 32: surface-water drainage, Church Street, Cliffe

Condition discharged
Homes gateway decisionDeveloper Esquire Developments

Details submitted to discharge condition 32. As amended, condition 32 bars development in any phase or sub-phase, highway works excepted, until a surface-water drainage scheme is approved. Medway approved it on 15 September 2026 under delegated powers, thirteen days before its own target date. It discharged the condition “for ALL PHASES”. The decision notice gives one reason: “the submitted information has been reviewed, and it is considered that the details are acceptable”. It refers to none of the twelve objections made on the application. No officer report, consultee response or habitats screening has been published with it. The Phase 2 investigation filed by the applicant had said shallow soakaways into the Seaford Chalk would not be a viable option for disposing of surface water. On 16 September 2026 the group’s committee wrote to the case officer asking Medway to publish its record of the decision, to answer twelve questions in writing and to say by 30 September 2026 whether it will look at the decision again.

  • Where the surface water from the site actually goes
  • A possible pathway to the Thames Estuary and Marshes Ramsar site
  • Whether one approval can stand for every phase of the development

Consultation ended 4 September 2026 — still undecided

View MC/26/1459 on the portal (opens in a new tab)Open its own page: Condition 32: surface-water drainage Read the group’s letter on MC/26/1459 (opens in a new tab)Checked 2026-10-09

Conditions 20 to 23: contamination and remediation, Church Street, Cliffe

Condition discharged
Homes gateway decisionDeveloper Esquire Developments

Details submitted to discharge conditions 20 to 23, the site investigation and remediation conditions, which bar development until they are met. Medway’s register describes it as conditions 22 and 23; the application form, the applicant’s covering letter and the decision notice all give conditions 20 to 23. Medway discharged all four on 8 October 2026 under delegated powers, on its own target date, “for the whole site (All 3 plots)”. The notice accepts the conclusion of the Phase 2 Geo-Environmental Investigation, prepared in August 2025 for Trenport Investments Limited and Rosechurch Homes Limited, that no remediation work is necessary on any of the three plots. It records objections and representations from sixteen households or representatives and says they concern wider matters and do not directly relate to the contamination conditions. Where residents referred to the investigation, it says “the specialist consultation response received is sufficient”. No consultee response has been published: on 9 October 2026 the file held four documents, the application form, the covering letter, the investigation and the decision notice. The investigation records a Nitrate Vulnerable Zone on the site itself.

  • Whether the remediation strategy answers what conditions 20 to 23 require
  • A Nitrate Vulnerable Zone recorded on the site itself

Consultation ended 16 September 2026 — still undecided

View MC/26/1542 on the portal (opens in a new tab)Open its own page: Conditions 20 to 23: contamination and remediation Checked 2026-10-09

Land east and west of Church Street — the outline permission, Cliffe

Permission granted
Homes up to 250Developer Trenport Investments

Outline permission for up to 250 homes, a mixed-use community hub and a replacement sports ground and pavilion, with accesses from Church Street, Cooling Road and Buttway Lane. Medway’s Planning Committee refused it on 19 October 2022, against the officer recommendation. The public inquiry sat from 16 to 24 May 2023. During it, after the cross-examination of the council’s witness, Medway confirmed in an amended statement of case dated 22 May 2023 that it no longer wished to maintain its reasons for refusal; press reports said the developer’s legal team had indicated it would seek costs of around £100,000. The parish council and the residents’ group both appeared, the group through four of its members, against the appellant’s King’s Counsel and four witnesses. The Inspector allowed the appeal on 28 November 2023 with 54 conditions. Non-material amendment MC/24/0750, dated 3 May 2024, amended conditions 1, 7, 9, 10, 21, 22, 26, 32, 34 and 54. It amended no others. A section 106 agreement dated 2 June 2023 sits alongside it. The principle of development is settled and closed — which is exactly why the fight is now about the applications above.

  • The APCM Cliffe Recreation Ground
  • Arable land on both sides of the village
  • Church Street, Cooling Road and Buttway Lane as the only ways in and out
View MC/22/0254 on the portal (opens in a new tab)Open its own page: Land east and west of Church Street — the outline permission Checked 2026-10-09

Land south of View Road — 25 homes, Cliffe Woods

Permission granted
Homes 25Developer Esquire Developments

Twenty-five dwellings with landscaping, parking, earthworks and a new vehicular access from View Road, on the same land as the 68. Permission granted: conditions on ancient woodland buffer, habitat creation, ecological mitigation and landscaping were all discharged during 2025. The same address, land south of View Road, also carries the full permission for fifty retirement homes granted under MC/22/1713 on 10 May 2023. Medway’s file gives that permission an expiry date of 10 May 2026; whether it was implemented before then and if so whether the two overlap, is not settled (see that entry).

  • An ancient woodland buffer on the site
  • A second Esquire scheme on the same field
View MC/24/0279 on the portal (opens in a new tab)Open its own page: Land south of View Road — 25 homes Checked 2026-10-09

50 retirement homes, land south of View Road, Cliffe Woods

Permission granted
Homes 50 retirement homesDeveloper Not confirmed

The full history, from Medway’s file. Outline permission for 50 retirement homes was refused on 10 November 2017 under MC/16/3742, then allowed on appeal under APP/A2280/W/18/3202264. Reserved matters MC/19/2836 was refused on 17 September 2020 — the scheme councillors threw out as out of character, the round compared in coverage to army barracks. Conditions 8 and 12 were discharged in March 2021 and a second reserved matters application, MC/21/0323, was refused on 28 June 2021. Then, on 10 May 2023, Medway granted full permission under MC/22/1713 for 50 retirement homes as 42 apartments and 8 bungalows, with communal facilities, parking, landscaping and on-site allotments. Checked on 14 September 2026, Medway’s file gives it a permission expiry date of 10 May 2026. No document has been filed on it since 2023 and nothing on the file shows that work started or that its conditions were discharged. Whether the permission was implemented before that date is not shown. The open question on the register is whether it was and if so whether it overlaps the 25 dwellings permitted under MC/24/0279. Until that is settled no homes are counted here, rather than risk counting the same field twice.

  • Full permission for 50 homes, granted 10 May 2023, with an expiry date of 10 May 2026 on Medway’s file
  • Whether it was implemented before 10 May 2026 and if so whether it overlaps the 25 dwellings under MC/24/0279
  • A precedent for scale and design on the edge of the village
View MC/22/1713 on the portal (opens in a new tab)Open its own page: 50 retirement homes, land south of View Road Checked 2026-10-09

Buckland Road — 44 homes, Cliffe Woods

Permission granted
Homes 44Developer Redrow

Forty-four dwellings, a quarter of them affordable, with access, public open space and landscaping. Permission granted on 23 June 2025. Applications to discharge condition 15 (construction environmental management, MC/26/0061) and condition 16 (air quality, MC/26/0078) were both made in January 2026. Medway discharged condition 15 on 22 September 2026. The notice gives one reason: that the submitted information has been reviewed and the details are considered acceptable. Condition 16 was still undecided on Medway’s file on 9 October 2026, more than six months past the council’s own target date of 17 March 2026. The parish council’s tracker lists this as 45 — the council’s own file says 44.

  • Another 44 homes on the Buckland Road side of the village
View MC/23/0531 on the portal (opens in a new tab)Open its own page: Buckland Road — 44 homes Checked 2026-10-09

APCM Recreation Ground, Church Street, Cliffe

Watching
Homes the recDeveloper Owned by Trenport Investments

The village recreation ground, now inside the development site and owned by Trenport Investments — which the group’s own title research dates to 2001. Residents had it listed as an Asset of Community Value in 2022. Medway received the owner’s notice of intended disposal on 18 December 2024 and the community had until 30 January 2025 to ask to be treated as a bidder; the group registered its intention to bid within that window. The owner had also asked Medway to treat the sale as a part-listed disposal, which would be exempt. On 3 March 2025 Medway’s Director of Place confirmed that it was an exempt disposal under section 95(5)(e) of the Localism Act 2011, so the moratorium did not apply and the owner was able to proceed with the disposal. Medway’s notice records that the remainder of the site stays on its list of Assets of Community Value. Separately the group is assembling the evidence on Medway’s historic and current property interest — a deed dated 17 January 1975 and a licence dated 6 February 1975 and whether a statutory trust or public open space status arises — along with a historical document said to show the field was left to the village in 1972. Public use is already well evidenced; the legal character of the council’s interest is not.

  • A recreation ground used by several sports clubs
  • Whether a statutory trust over public open space survives
  • Medway ruled the 2025 disposal exempt, so the moratorium did not apply
Search Medway’s portal (opens in a new tab)Open its own page: APCM Recreation Ground Checked 2026-09-14

Cliffe Marshes and the protected wetland, Cliffe Marshes

Watching
Homes n/aDeveloper —

The marshes north and west of the village are the Thames Estuary and Marshes Ramsar site and Special Protection Area, with the South Thames Estuary and Marshes SSSI alongside. The appeal decision of 28 November 2023 records the Church Street site as within 6km of the Thames Estuary and Marshes Special Protection Area and Ramsar site (paragraph 53). The applicant’s own Drainage Technical Note puts Cliffe Marshes approximately 450 metres north of the site and the 2021 ground conditions assessment records the designated area as immediately to the west and about 500 metres north. The group has asked Medway to state the distance from Natural England’s published designated-sites data. The Phase 2 investigation also records a Nitrate Vulnerable Zone on the site itself and gives the North Kent Medway Chalk groundwater a Water Framework Directive status of Poor.

  • Internationally protected wetland and the birds that use it
  • The RSPB Cliffe Pools reserve on the village’s doorstep
  • Groundwater already classified as Poor
Search Medway’s portal (opens in a new tab)Open its own page: Cliffe Marshes and the protected wetland Checked 2026-09-14

Land off Higham Road, beside Eternal Lake Nature Reserve, Higham Road, Cliffe

Refused
Homes up to 100Developer Gleeson Land

Outline application for up to 100 dwellings on a 5.18 hectare site south of Higham Road and east of Buckland Road, immediately beside the Eternal Lake Nature Reserve, with access from Higham Road. Received 5 February 2026. The officer report recorded 139 letters of objection, together with objections from Cliffe and Cliffe Woods Parish Council, residents, councillors and other organisations — including the RSPB, which objected over recreational and urbanisation impacts on the surrounding designated sites. Natural England did not take a position: it told Medway it was not able to give specific advice on the application and referred the council to its standing advice. Kent Wildlife Trust did not comment. REFUSED by Medway’s Planning Committee on 26 August 2026, in line with the officer recommendation as amended. The published officer report recommended refusal for five reasons; a sixth, on the Special Protection Areas, was added by the Supplementary Agenda Advice Sheet on the day, which also rewrote the other five to match the National Planning Policy Framework published on 17 August 2026. Officers accepted that Medway cannot demonstrate a five-year housing land supply — the developer’s central argument — and that the tilted balance applies and recommended refusal regardless. Medway issued the decision notice on 7 September 2026, giving the six reasons as amended on the day. The six-month period for an appeal to the Planning Inspectorate runs from that date.

Refused for 6 reasons
  1. Conflict with the development plan, on an unallocated greenfield site outside the settlement boundary
  2. Harm to existing residents and to the rural character of Higham Road
  3. Unacceptable landscape and visual harm, urbanising the edge of Cliffe
  4. Permanent loss of 5.18 hectares of Grade 3a best and most versatile agricultural land
  5. No completed agreement securing affordable housing or infrastructure contributions
  6. Failure to address effects on the Thames Estuary and Marshes and Medway Estuary and Marshes Special Protection Areas, including appropriate assessment and mitigation
  • Land right beside the Eternal Lake Nature Reserve
  • Best and most versatile agricultural land
  • A new access onto Higham Road
What was argued (opens in a new tab)Open its own page: Land off Higham Road, beside Eternal Lake Nature Reserve Checked 2026-10-09

Three homes at Westfield, Town Road, Town Road, Cliffe Woods

Refused
Homes 3Developer Private applicant

A full application for three detached two-storey, three-bedroom houses on about 2,556 square metres of the garden of Westfield, a bungalow on the western side of Town Road between Cliffe Woods and Cliffe, with a new access onto Town Road. Received and validated on 4 March 2026. The site lies outside any settlement boundary, in the countryside. The parish council objected, on highway safety near a bend and the brow of a hill and because the site lies in the gap between the two villages that the Neighbourhood Plan protects. Dickens Country Protection Society also objected. Medway refused it on 24 September 2026, by a decision of its officers, for five reasons. The first is that it would bring more housing into the rural gap between Cliffe and Cliffe Woods and undermine the separation between them, contrary to the Medway Local Plan, policy SUSDEV1 of the Neighbourhood Plan and the National Planning Policy Framework 2026. The second also cites Neighbourhood Plan policies H6, SUSDEV1 and SUSDEV4. Medway’s internal target date had been 29 April 2026.

Refused for 5 reasons
  1. Housing in the countryside, in the rural gap between Cliffe and Cliffe Woods, undermining their separation
  2. A consolidated suburban form out of keeping with the rural character of the area
  3. Not enough highway information to show a safe access onto Town Road
  4. No secured off-site units for the mandatory 10% biodiversity net gain
  5. Failure to address effects on the Thames Estuary and Marshes and Medway Estuary and Marshes Special Protection Areas
  • The gap between Cliffe and Cliffe Woods
  • A new access onto Town Road, the B2000
View MC/26/0432 on the portal (opens in a new tab)Open its own page: Three homes at Westfield, Town Road Checked 2026-10-09

The live argument

What the group has asked Medway to do

Filed 14, 19 and 21 August 2026. It does not reopen the principle of development — that was settled by the Inspector in November 2023 and the group accepts it is closed.

The point is narrower and harder to answer. Outline permission established that the development may happen. It did not, by itself, authorise every phase to start. The developer still needs the reserved matters approvals and the condition discharges — and the legal question is whether one of those later decisions is the moment a phase becomes lawfully capable of proceeding.

In C G Fry & Son Ltd v Secretary of State [2025] UKSC 35 the Supreme Court held that the Habitats Regulations are not necessarily dealt with once and for all at outline stage: regulation 63 can apply to a reserved matters approval, or to the discharge of a condition, where that is what authorises the project to proceed. And since 21 May 2026, regulation 63(1A) has extended the appropriate-assessment duty to Ramsar sites. The Thames Estuary and Marshes is one.

An appropriate assessment was carried out at the 2023 appeal (paragraphs 53 to 55 of the decision). As the decision describes it, it addressed recreational disturbance, mitigated through the strategic financial contribution Natural England accepted. The decision does not discuss surface-water or groundwater pathways. Regulation 63(1A) has since made the assessment duty statutory for Ramsar sites.

What the documents say about the distance

  • Within 6km — Thames Estuary and Marshes SPA and Ramsar site (appeal decision, paragraph 53)
  • 450 m — Cliffe Marshes, north (Drainage Technical Note, paragraph 4.23)
  • 500 m — designated area north and “immediately to the west” (ground conditions assessment, 2021)
  • Nitrate Vulnerable Zone recorded on site
  • North Kent Medway Chalk groundwater: Poor

The 6km figure is the Inspector’s. The 450 m figure is from the Drainage Technical Note filed by the applicant. The 500 m figure is from the 2021 ground conditions assessment. The group does not assert that any one of them is correct. It has asked Medway to state the distance from Natural England’s published designated-sites data.

The five steps Medway must take

  • Decide whether each application authorises the project, or a phase, to proceed
  • Assess whether there could be a likely significant effect on the Ramsar site or the SPA
  • If that risk can be ruled out on objective evidence, record and publish why
  • If it cannot, carry out an appropriate assessment before granting approval
  • If integrity cannot be assured, it cannot simply grant and resolve it later

What the group is not saying

Not that harm to the wetland is proved. Not that the homes can be stopped. The question put to Medway is narrower: on the objective evidence currently available, how does the council propose to exclude a likely significant effect?

The group has also withdrawn points that did not survive its own checking — a regulation 65 argument, two statements about surface water written before it had read the Drainage Technical Note and a complaint about the council’s constraints record. What remains stands on documents alone.

Where Natural England stands

It replied twice in August 2026. It cannot give bespoke advice to individuals and must base its consultation responses on what the local planning authority provides. It directs concerns back to Medway, which is responsible for the final decision.

Which is why comments go to Medway, not to Natural England.

All of it at once

How the sites sit around the two villages

Each application is assessed on its own, so nobody in the process is ever required to look at this picture. A diagram, not a survey — positions are approximate and it is not to scale. Every marker opens the council’s own map for that application.

The diary

What happens next

Every date the council has published for the live applications. Dates that have passed drop off this list on their own.

Put every deadline in your phone’s calendar It updates itself when Medway publishes a new date. You can also download the calendar file or print a one-page poster of every deadline (opens in a new tab) for a noticeboard or a shop window (A4).

  1. MC/26/1809 Comment by — condition 13: the Town Road signage
    Comment on MC/26/1809 (opens in a new tab)

Making it count

How to object so that it lands

Planning officers weigh comments against policy, not against volume. A hundred identical template letters count for less than a dozen letters that each name a real, material problem.

Where to comment

Search the application reference on Medway Council’s public access portal, open the application and use the comment form. The dates on this page are when Medway’s consultation period ends. They are not a cut-off: the council must take account of what it has received when it makes its decision, so a comment after the date can still count while the application is undecided. Comments sent before the date are certain to be on the file when the officer reads it, which is why they are worth more.

You need a Medway portal login to comment online — registering takes a minute. If you would rather not, comments can be emailed instead to planning.representations@medway.gov.uk, quoting the reference.

Open the portal → (opens in a new tab)

What counts

  • Highway safety, access and traffic generation
  • Drainage, surface water and flood risk
  • Ecology, protected species and protected habitat
  • Loss of best and most versatile agricultural land
  • Design, scale and harm to the character of the village
  • Heritage assets and their setting
  • Capacity of schools, GP surgeries and infrastructure

What does not

  • The effect on your property value
  • Loss of a private view
  • Who the developer is, or their conduct elsewhere
  • Competition with existing businesses
  • Boundary disputes and private covenants

Say these things at a public meeting if you like. Do not spend your written objection on them.

Church Street: detail only

Outline permission was granted on appeal in November 2023. The principle of building there is settled and the group does not seek to reopen it. The eleven Church Street applications now before Medway (MC/26/1465, 1466, 1467, 1646, 1719, 1720, 1721, 1722, 1723, 1724 and 1809) test only the detail — remediation, layout, landscaping, highways, noise, air quality and travel.

An objection that says “no more houses” will be set aside as not relevant. An objection that says the travel plan leaves out commitments made at the appeal has to be answered.

Higham Road: refused, but watch for an appeal

MC/26/0194, up to 100 dwellings off Higham Road beside the Eternal Lake Nature Reserve, was refused on 26 August 2026. Comments on it are closed and there is nothing to object to at present.

If Gleeson Land appeals to the Planning Inspectorate, this page will say so. Because the application was made before 1 April 2026, residents keep the right to write to the Inspectorate at appeal stage. The Church Street applications above were made after that date: if one is refused and the appeal is decided on written representations, residents cannot send the Inspectorate anything new, so what you send Medway now is what an Inspector would see. They could write again only if the Inspectorate chose a hearing or an inquiry, or on an appeal against non-determination.

Who to copy

Send the same points to Cliffe and Cliffe Woods Parish Council and to your ward councillors. The parish council is a statutory consultee: its response carries weight the individual letters do not and it can only make points it has been told about.

Write it in your own words

Name the road you use, the school your children go to, the field you walk. Specific local evidence is the one thing a developer’s consultants cannot produce from an office and the one thing an inspector cannot dismiss as generic.

Make it count

Build your objection

Pick an application and the points that matter to you. This assembles a properly structured draft you can edit and send. Every ground offered here is one the Council has to answer on that application — nothing here will be set aside as not relevant.

Choose the application in the box below. Tick the grounds that matter to you, untick any that do not and write your own paragraph at the bottom. On MC/26/1646, the design of the replacement recreation ground, the two strongest grounds start ticked. The group’s own objection (opens in a new tab) to MC/26/1646 sets those points out in full.

Start from a template

Each letter is written for a different kind of resident and makes a different point, so that we do not all send the Council the same letter. Pick the one that fits you, then change it. The parts in [square brackets] are for your own evidence — a letter sent with the brackets still in it will be discounted and the evidence is the part no consultant can answer. The MC/26/1646 letters as a printable sheet (opens in a new tab), for anyone who would rather do this on paper or hand them round.
Your grounds
Name the road you use, the school your children go to, the field you walk: specific local evidence is the one thing a developer’s consultants cannot produce from an office. Officers weigh what is said, not how many say it. A paragraph of your own is worth more than the rest of this put together.
Your name and address go at the end of the letter. This page does not send or keep them.

You will need a Medway portal login, or you can email it to planning.representations@medway.gov.uk quoting the reference. Your name and address appear on the public file; the rest of your details do not.

Why it matters here

What is actually on the table

Cliffe and Cliffe Woods sit with marshes and estuary on one side and arable fields on the other. The RSPB’s Cliffe Pools reserve is on the doorstep and the marshes beyond it carry international wetland protection. This is not a green belt argument about pretty views. It is farmland, feeding habitat and a working landscape, with two villages threaded through it on a handful of roads.

The schemes in the register do not arrive together. That is the difficulty. Each is assessed on its own: a hundred here, sixty-eight there, twenty-five on the same lane. The cumulative effect on the doctor’s surgery, the school and the junctions at Town Road and Church Street is nobody’s single application to answer. Which is precisely why keeping them all on one page is worth doing.

This register covers Cliffe and Cliffe Woods only — the two villages, their fields and their marshes. Nothing else belongs on it and nothing that happens here should be lost in a wider borough total.

How we got here

The Church Street story, in order

Worth reading in full if you are new to this. It explains why the current applications are about drainage and design codes rather than about whether to build at all.

  1. 225 homes at Cliffe Woods refused — and the appeal dismissed

    Medway refused Gladman’s scheme on the edge of Cliffe Woods under MC/16/3669. Gladman appealed and the Inspector recommended it be allowed, but the Secretary of State recovered the appeal and on 8 November 2018 dismissed it, refusing permission. Residents, the parish council, ward councillors and the MP for Rochester and Strood had objected. That objection succeeded.

  2. Trenport applies for up to 250 homes at Church Street

    An outline application with all matters reserved except access, covering land on both sides of Church Street including the recreation ground.

  3. Medway’s planning committee refuses it

    Councillors rebelled against the officer recommendation, finding the scheme would harm the character of the historic village.

  4. Medway drops its reasons for refusal at the inquiry

    The public inquiry sat from 16 to 24 May 2023. During it, after the cross-examination of the council’s witness, Medway confirmed in an amended statement of case dated 22 May 2023 that it no longer wished to maintain its reasons for refusal. Press reports said the developer’s legal team had indicated it would seek costs of around £100,000. The parish council and the residents’ group both appeared, the group through four of its members, against the appellant’s King’s Counsel and four witnesses.

  5. Section 106 agreement completed

    The agreement that sits alongside the permission and secures its contributions.

  6. The Inspector allows the appeal

    Outline permission granted under APP/A2280/W/22/3313673, subject to 54 conditions. The principle of development is settled from this date.

  7. Non-material amendment MC/24/0750

    Amends conditions 1, 7, 9, 10, 21, 22, 26, 32, 34 and 54. It amends no others. The remaining conditions stand in the Inspector’s original wording.

  8. Three conditions discharged

    Condition 5 under MC/24/0801, condition 6 (design codes) under MC/24/1396 and condition 53 under MC/25/0101 on 4 March 2025.

  9. C G Fry & Son Ltd v SSHCLG [2025] UKSC 35

    The Supreme Court holds that the Habitats Regulations are not necessarily dealt with once and for all at outline stage. A later reserved matters approval or condition discharge can engage regulation 63 where it is the decision that authorises the project, or a phase of it, to proceed.

  10. The Ramsar duty commences

    Regulation 63(1A), inserted by the Planning and Infrastructure Act 2025 and commenced by SI 2026/549, extends the appropriate-assessment duty to Ramsar sites. The Thames Estuary and Marshes is a Ramsar site within that definition. An appropriate assessment was carried out at the 2023 Church Street appeal (paragraphs 53 to 55 of the decision). As the decision describes it, it addressed recreational disturbance, mitigated through the strategic financial contribution Natural England accepted. The decision does not discuss surface-water or groundwater pathways.

  11. Five applications land together

    MC/26/1459, MC/26/1465, MC/26/1466, MC/26/1467 and MC/26/1542 — drainage, three sets of reserved matters and remediation.

  12. The group files its representation and objection

    Representation on the reserved matters and drainage applications, a separate objection on MC/26/1542 and a letter to the Head of Planning on MC/22/0254.

  13. Supplementary representation on regulation 63

    Asks Medway to determine expressly, before granting any of the five, whether each decision is a consent, permission or other authorisation for the purposes of regulation 63.

  14. Formal representation filed and three points withdrawn

    A full representation is filed with the Principal Planning Officer. The group withdraws its regulation 65 argument, two statements about surface water made before it had read the Drainage Technical Note and a complaint about the council’s constraints record — so that the remaining points stand on evidence alone.

  15. Higham Road refused

    Medway’s Planning Committee refuses MC/26/0194, up to 100 houses on farmland off Higham Road, following the officer recommendation as amended by the Supplementary Agenda Advice Sheet. Six reasons are given: five from the published report, rewritten to match the National Planning Policy Framework of 17 August 2026, plus a sixth added on the day on the Special Protection Areas. The decision notice followed on 7 September 2026.

  16. A sixth application, on the rec itself

    MC/26/1646 asks Medway to approve the design and layout of the pitches, courts and pavilion under condition 41 of the appeal decision. Two documents are filed: an application form and a single site plan. Comment by 24 September 2026, when Medway’s consultation period ends.

  17. Higham Road: the refusal notice is issued

    Medway issues the decision notice refusing MC/26/0194, with the six reasons agreed at committee. The six months in which Gleeson Land can appeal to the Planning Inspectorate run from this date.

  18. The group objects on condition 41

    An eight-ground objection to MC/26/1646, asking Medway to refuse the application or hold it undetermined. The appeal decision recorded three tennis courts, three cricket nets and a new pavilion housing two changing rooms. The applicant’s own planning statement offers two courts and no nets and the pavilion drawing forms no part of this application.

  19. A further ground: the overhead line

    The group files a supplementary objection to MC/26/1646 on a single further ground. The applicant’s own Utilities Assessment records a high voltage overhead line crossing the site at the location of the proposed playing fields and states that it is to be left in situ. The drawing submitted under condition 41 does not show it. The group first raised the point in its Objection Addendum of 11 October 2022. The appeal decision records at paragraph 63 that the existing overhead cables would be removed and redirected underground; the drawing does not show that either.

  20. Six more applications land in two days

    MC/26/1719 to MC/26/1724 — the travel plan, air quality, three sets of highway works and noise. Five of them are pre-commencement conditions on the appeal decision. One, MC/26/1721, went on the register with no documents at all. The group found MC/26/1723 on 9 September and MC/26/1719 on 11 September.

  21. The group objects to all five and files two supplementaries

    Five objections and a covering letter, one to each of MC/26/1720 to MC/26/1724, followed by a supplementary objection across all five on the EIA Regulations and another on the health evidence for the three reserved matters applications. Only three of the 54 conditions have ever been discharged.

  22. Closing dates set and a sixth new application found

    Medway publishes 21-day consultation periods on MC/26/1719 to MC/26/1724, closing on 1 and 2 October 2026. MC/26/1719, the travel plan under condition 15, joins the register. MC/26/1721 now has an application form and four drawings on its file. Twelve applications on the Church Street land are undetermined.

  23. The group objects to the travel plan

    A six-ground objection to MC/26/1719. The plan filed under condition 15 is marked as a draft, names no phase of the development, covers the homes but not the community hub or the sports ground and drops ten commitments made in the 2022 Framework Travel Plan. All six of the applications validated on 7 and 8 September now carry an objection from the group.

  24. Medway approves the drainage scheme

    Officers discharge condition 32 on MC/26/1459 for every phase, thirteen days before Medway’s own target date. The notice gives one reason: that the details are acceptable. It refers to none of the twelve objections.

  25. The group asks Medway to look again

    The committee writes to the case officer asking Medway to publish its record of the drainage decision, answer twelve questions in writing and say by 30 September whether it will look at the decision again.

  26. Medway’s consultation ends on the remediation scheme

    The consultation on MC/26/1542, conditions 20 to 23, ends. Medway’s own target date for deciding it is 8 October.

  27. A question about the affordable housing

    The committee writes to the case officer for MC/26/1465. The section 106 agreement of 2 June 2023 secures 60 per cent affordable rented housing and 40 per cent shared ownership. The planning statement filed with the application offers 60 per cent affordable rent and 40 per cent social rent across 63 of the 250 homes. The letter asks Medway four questions about which tenure mix applies and asks for a reply within 10 working days.

  28. A further application on the Church Street land

    Medway validates MC/26/1809, the highway works required by condition 13 of the appeal decision. Its file holds an application form and two signage drawings, one for Town Road north and one for Town Road south. Consultation opens on 23 September and closes on 14 October 2026.

  29. Condition 15 discharged at Buckland Road

    Officers discharge the construction environmental management plan on the 44-home Redrow scheme at Buckland Road under MC/26/0061, eight months after the application was made. The notice gives one reason: that the details are considered acceptable. Condition 16, on air quality, remains undecided six months past Medway’s own target date.

  30. Medway’s consultation ends on the replacement recreation ground

    The consultation on MC/26/1646, the design and layout of the pitches, courts and pavilion under condition 41, ends. Medway’s register recorded twenty-two comments on it the next day and twenty-seven on 2 October, all of them objections. Medway’s own target date for deciding it is 23 October.

  31. Three homes at Westfield, Town Road, refused

    Medway refuses MC/26/0432, three houses in the garden of Westfield on Town Road, for five reasons. The first is that it would bring more housing into the rural gap between Cliffe and Cliffe Woods, contrary to policy SUSDEV1 of the Neighbourhood Plan among others. The parish council had objected.

  32. Medway’s consultation ends on two road schemes

    The consultations on MC/26/1722, the Buttway Lane access into the new sports ground under condition 11 and MC/26/1723, the Cooling Road improvements under condition 12, end. Medway’s register recorded nine and eight comments on them on 2 October, all of them objections. Medway’s own target dates for deciding them are 3 and 2 November.

  33. Medway’s consultation ends on four more

    The consultations on MC/26/1719, the travel plan, MC/26/1720, air quality, MC/26/1721, the Cooling Road highway works and MC/26/1724, noise, end. Medway’s register recorded seven comments on each on 2 October, all of them objections, among them the parish council’s response on the travel plan, dated 24 September. None of the six applications validated on 7 and 8 September had been decided as at 2 October.

  34. Medway discharges the contamination conditions

    Officers discharge conditions 20 to 23 on MC/26/1542 for the whole site, on Medway’s own target date. The notice accepts the conclusion of the investigation the applicant filed, that no remediation work is necessary. It records objections from sixteen households or representatives and says they do not directly relate to the contamination conditions.

Noticeboard

Latest from the group

Posted by members. Newest first.

Newsletter, 9 October: contamination conditions discharged

Four pages, in plain English. Medway discharged conditions 20 to 23 on MC/26/1542 on 8 October for the whole site. Its decision letter relies on a specialist consultation response that has not been published. Objections on MC/26/1719 to MC/26/1724 rose from forty-five on 2 October to seventy-three on 9 October. None of the six has been decided; Medway’s own target dates are 2 and 3 November. MC/26/1809 is open until 14 October.

Read the newsletter: Newsletter, 9 October: contamination conditions discharged (opens in a new tab)

Medway discharges the contamination conditions

Medway decided MC/26/1542 on 8 October 2026, its own target date. Officers discharged conditions 20 to 23 of the Church Street appeal decision, the site investigation and remediation conditions, for the whole site. The notice accepts the conclusion of the Phase 2 Geo-Environmental Investigation the applicant filed, that no remediation work is necessary on any of the three plots. It records objections and representations from sixteen households or representatives and says they concern wider matters and do not directly relate to the contamination conditions. Where residents referred to the investigation, it says the specialist consultation response received is sufficient. No consultee response has been published on the file. With condition 32 discharged on 15 September, this is the second decision on the Church Street land this autumn. The application has left the objection builder.

MC/26/1542 on Medway’s file: Medway discharges the contamination conditions (opens in a new tab)

Three homes at Westfield, Town Road, refused

Medway refused MC/26/0432 on 24 September 2026. The application was for three detached houses in the garden of Westfield, on the western side of Town Road between Cliffe Woods and Cliffe. Medway’s officers gave five reasons. The first is that it would bring more housing into the rural gap between Cliffe and Cliffe Woods and undermine the separation between them, contrary to policy SUSDEV1 of the Neighbourhood Plan among others. The others concern the rural character of the area, the access onto Town Road, biodiversity net gain and the Special Protection Areas. The parish council had objected. The application now has its own page on this register.

MC/26/0432 on Medway’s file: Three homes at Westfield, Town Road, refused (opens in a new tab)

Newsletter, 2 October: six closed, one still open

Five pages, in plain English. The six applications validated on 7 and 8 September, MC/26/1719 to MC/26/1724, closed on 1 and 2 October with forty-five objections between them on Medway’s file. None has been decided; Medway’s own target dates are 2 and 3 November. The parish council’s response on the travel plan is on the file. MC/26/1809 is the one application on the Church Street land still open, until 14 October. Medway refused three homes at Westfield, Town Road, on 24 September.

Read the newsletter: Newsletter, 2 October: six closed, one still open (opens in a new tab)

Six consultations close on the Church Street land

Medway’s consultation periods on MC/26/1722 and MC/26/1723 ended on 1 October 2026 and on MC/26/1719, MC/26/1720, MC/26/1721 and MC/26/1724 on 2 October 2026. On 2 October Medway’s register recorded forty-five comments across the six, all of them objections: nine on MC/26/1722, eight on MC/26/1723 and seven on each of the other four. None had been decided. Medway’s own target dates for deciding them are 2 and 3 November 2026. A comment can still count while an application is undecided. MC/26/1809, the Town Road signage under condition 13, is open until 14 October.

MC/26/1719 on Medway’s file: Six consultations close on the Church Street land (opens in a new tab)

The group asks Medway about the affordable housing at Church Street

On 18 September 2026 the committee wrote to the case officer for MC/26/1465, the reserved matters for the 250 homes. The section 106 agreement of 2 June 2023 says the affordable homes shall be 60 per cent affordable rented housing and 40 per cent shared ownership accommodation. The planning statement filed with the application says 25 per cent of the homes will be affordable, split 60 per cent affordable rent and 40 per cent social rent. It gives the number of affordable homes as 63 out of 250. Shared ownership is a part-buy tenure; social rent is not. The letter asks Medway which mix it understands the agreement to require, which is now proposed, whether it considers the two consistent, and, if it relies on any variation or approved affordable housing plan, to identify it and provide a copy. It asks for a reply within 10 working days. The letter states that it is a request for clarification rather than a representation, although Medway’s document list records it as an objection.

The letter on Medway’s file: The group asks Medway about the affordable housing at Church Street (opens in a new tab)

Newsletter, 25 September: one closed, a seventh arrives

Six pages, in plain English. Comments on MC/26/1646, the replacement recreation ground, closed on 24 September with twenty-two objections on Medway’s file, eleven of them filed in the last week. A seventh application on the Church Street land, MC/26/1809, was validated on 21 September and closes on 14 October. Medway discharged condition 15 at Buckland Road on 22 September. Six applications close on 1 and 2 October. The answer the committee asked Medway for on the drainage decision is due by 30 September.

Read the newsletter: Newsletter, 25 September: one closed, a seventh arrives (opens in a new tab)

A further application on the Church Street land, MC/26/1809

Medway validated MC/26/1809 on 21 September 2026. It asks the council to approve the highway works required by condition 13 of the appeal decision. Three documents are on the file: an application form and two drawings titled ‘Highway works signage plans’, one for Town Road north and one for Town Road south. Consultation opened on 23 September and closes on 14 October 2026. Medway’s own target date for deciding it is 16 November 2026. It now has its own page on this register, with the points the group has taken from the documents on the file.

MC/26/1809 on Medway’s file: A further application on the Church Street land, MC/26/1809 (opens in a new tab)

Medway discharges condition 15 at Buckland Road

On 22 September 2026 Medway discharged condition 15, the construction environmental management plan, on the 44-home Redrow scheme at Buckland Road, Cliffe Woods. The application, MC/26/0061, was made on 16 January 2026. It was decided by officers. The notice gives one reason: that the submitted information has been reviewed and the details are considered acceptable. It records the condition as having been imposed in the interests of the residential amenity of adjoining properties. No comments were made on the application. The second application on that permission, MC/26/0078 on air quality, is still undecided; Medway’s own target date for it was 17 March 2026.

The decision notice on Medway’s file: Medway discharges condition 15 at Buckland Road (opens in a new tab)

MC/26/1646 is closed to comment

Comments on MC/26/1646, the design and layout of the pitches, courts and pavilion under condition 41, closed on 24 September 2026. Medway’s register records twenty-two comments, all of them objections, eleven of them filed in the last week before it closed. Medway has not decided it. Its own target date is 23 October 2026, which is earlier than its 2 November target for MC/26/1467, the reserved matters that fix the layout those details depend on. MC/26/1722 and MC/26/1723 are the next to close, on 1 October.

MC/26/1646 dates on Medway’s file: MC/26/1646 is closed to comment (opens in a new tab)

Newsletter, 18 September: one approved, eleven still waiting

Six pages, in plain English. The drainage scheme under MC/26/1459 was approved on 15 September and the committee has asked Medway to look at it again. Eleven applications on the Church Street land are still undecided. The group’s objections of 9 September to MC/26/1720 to MC/26/1724 are not yet on Medway’s public file, though all five can be read here. The recreation ground closes on 24 September and six more close on 1 and 2 October.

Read the newsletter: Newsletter, 18 September: one approved, eleven still waiting (opens in a new tab)

Correction: Oakleigh Fields is 187 homes, not 225

The register counted Oakleigh Fields at 225 homes, the most its outline permission allows. Medway’s own records show detailed approval for 184 homes in February 2022 (MC/21/1287) and three more in October 2025 (MC/25/1559), so 187 are approved in detail. The register now counts 187. The total consented around the two villages falls from 612 to 574. The Town Road entry, which said the later changes added no homes, has been corrected too.

The Oakleigh Fields entry: Correction: Oakleigh Fields is 187 homes, not 225

Medway approves the drainage scheme, MC/26/1459

Medway discharged condition 32 on 15 September 2026, approving the surface-water drainage scheme for every phase of the Church Street development. The decision was taken by officers, thirteen days before Medway’s own target date. Its notice gives a single reason: that the details are acceptable. It mentions none of the twelve objections made on the application. No officer report, consultee response or habitats screening has been published with it. Condition 32 was one of the conditions stopping development from starting. It no longer is. Others still are, including the construction management plan under condition 9.

The decision notice on Medway’s file: Medway approves the drainage scheme, MC/26/1459 (opens in a new tab)

The group asks Medway to look at the drainage decision again

On 16 September 2026 the group’s committee wrote to the case officer for MC/26/1459, copied to Medway’s Chief Planning Officer and Head of Development Management, Natural England, the parish council and the three ward councillors. The letter says the group could find no timetable for the drainage, no maintenance plan and no named owner for the basins, all of which condition 32 asks for. It says nothing on the file shows that the effect on the Ramsar site was screened or that the Environment Agency was consulted, although the developer’s own ground engineers advised that it must be. It asks Medway to publish its record of the decision, to answer twelve questions in writing and to say by 30 September whether it will look at the decision again. Residents have no right of appeal against a planning decision, so the letter asks Medway itself to reconsider.

Read the group’s letter: The group asks Medway to look at the drainage decision again (opens in a new tab)

Newsletter, 11 September: six applications, six objections

Five pages, in plain English. The 9 September issue said five applications had arrived on 7 and 8 September; there were six and the group says so at the top. The sixth, MC/26/1719, is the travel plan: marked as a draft, silent on the community hub and the sports ground and missing ten commitments made at the appeal. The group has objected to all six and all six now close on 1 or 2 October. The issue also covers the Higham Road refusal notice and sets out four dated posts for the weeks ahead.

Read the newsletter: Newsletter, 11 September: six applications, six objections (opens in a new tab)

The group objects to the travel plan, MC/26/1719

The group has filed a six-ground objection to MC/26/1719, the travel plan Medway is being asked to approve under condition 15. The condition requires a Final Detailed Travel Plan before each phase is occupied. What has been filed is marked ‘Draft’ on its cover, watermarked DRAFT on its pages and called a ‘Final draft’ in its own revision table. It names no phase, counts all 250 homes as one and says nothing about how people will reach the community hub or the replacement sports ground. Set against the Framework Travel Plan attached to the section 106 agreement, ten commitments are missing, among them a steering group with residents on it, personal travel advice for every household and surveys by an independent fieldwork company. Its baseline is the 2011 Census and on the Framework Travel Plan’s own build-out estimate the first survey could fall after the three-year monitoring period the plan quotes from the section 106 agreement has ended. The group asks Medway to refuse it, or to hold it until a final plan is filed for each phase once that phase’s layout is approved. Comment by 2 October 2026, when Medway’s consultation period ends.

Read the objection: The group objects to the travel plan, MC/26/1719 (opens in a new tab)

Closing dates set on the six new applications, one the group had missed

Medway has published consultation periods on all six applications validated on 7 and 8 September 2026. Comments on MC/26/1722 and MC/26/1723 close on 1 October 2026; on MC/26/1719, MC/26/1720, MC/26/1721 and MC/26/1724 they close on 2 October 2026. Each period runs for 21 days, which is what the group’s covering letter of 9 September asked for. One of the six had not been picked up here before. MC/26/1719 asks Medway to approve the travel plan required by condition 15; its file holds an application form and a 26-page travel plan by the consultancy DHA, marked ‘Draft’ on its cover. The group has since objected to it; see the notice above. MC/26/1721, which had nothing on its file on 9 September, now has an application form and four drawings. Twelve applications on the Church Street land are now undetermined.

Read the source: Closing dates set on the six new applications, one the group had missed (opens in a new tab)

Higham Road: the refusal notice is out

Medway issued the decision notice refusing MC/26/0194 on 7 September 2026. It gives the six reasons agreed at committee, as amended on the day and says an appeal must be made within six months of the date of the notice. The draft minutes of the 26 August meeting are now published as well. They record the refusal and its reasons but not how the vote went, so the unanimity reported by members present remains the group’s own account rather than the official record.

Read the source: Higham Road: the refusal notice is out (opens in a new tab)

Newsletter, 9 September: five more applications and one with nothing in it

Six pages, in plain English, on what has happened to the Church Street site in the last week and what it means for the village. In two days Medway took in five more applications. The group has read all of them and objected to all of them. One of them, MC/26/1721, has no documents on the register at all, so residents are being invited to comment on something nobody can read. The noise report submitted on another dates its own survey to 2056 and still has the letters X and Y where the temperature should be. The air quality one offers £175,000 of car chargers at £750 each, which buys 233 and a third houses on an application for 250. The issue also sets out the one thing worth knowing above all others: nothing can lawfully start on that site yet, because condition 9 covers site clearance and nobody has ever applied to discharge it. There is a posting calendar at the back and a short note on how to comment without being an expert.

Read the newsletter: Newsletter, 9 September: five more applications and one with nothing in it (opens in a new tab)

A supplementary objection across all five: the EIA Regulations

The group has filed a further letter, supplementary to all five objections below. It raises one point they did not. This permission is EIA development — the Inspector said so at paragraph 52 of the appeal decision and it was supported by a four-volume Environmental Statement. Each of these five applications is what the EIA Regulations call a subsequent application: an approval required by a condition which must be obtained before development may begin. The group has tested that condition by condition rather than assuming it and all five qualify. Regulation 3 then prohibits Medway from granting consent on any of them unless an environmental impact assessment has been carried out and regulation 9 gives it exactly two courses: if the environmental information already before it is adequate, it must take that into account; if it is not, it must serve a notice requiring more. There is no third option, so the question cannot go unasked. On two of the five, the applicant has already answered it. The noise report says the information needed “is not available” and that “it is not possible to undertake a definitive BS 4142 assessment”. The air quality statement relies on a calculation from January 2022 whose underlying values have been superseded twice. The letter asks Medway to record, on each file and before it decides, which of the two courses in regulation 9 it is taking and why.

Read the supplementary objection: A supplementary objection across all five: the EIA Regulations (opens in a new tab)

The group objects to all five of the new applications

Five objections were filed with Medway on 9 September 2026, one to each application, with a covering letter raising what they have in common. On MC/26/1720 the air quality statement calculates nothing: it carries a figure across from January 2022, when Medway’s own guidance says the latest Defra costs should always be used and Defra has updated them twice since and it then counts against that figure electric vehicle charge points the Building Regulations require anyway. On MC/26/1721 there was nothing on the register to read at all. On MC/26/1723 the register advertises works to ‘town roads’ while the condition and every drawing say Cooling Road. On MC/26/1722 the applicant seeks to discharge a condition naming four highway works on details for one of them, on drawings that offer the drainage to Kent County Council, which has had no highway function here since 1998. On MC/26/1724 the noise report dates its own survey to 2056, still carries the letters X and Y where the temperature should be and recommends discharging two conditions nobody has applied for. The covering letter asks Medway to record on any decision notice that approval confers no right to start work of any kind, because condition 9, the construction environmental management plan, has never even been applied for and covers site clearance.

Read the covering letter: The group objects to all five of the new applications (opens in a new tab)

Four more applications, one of them with no documents

Medway validated four further applications to discharge conditions on the Church Street permission on 7 and 8 September 2026: MC/26/1720 on air quality, MC/26/1721 and MC/26/1722 on highway works and MC/26/1724 on noise. Internal target dates are 2 and 3 November. MC/26/1721 was validated on 7 September and its documents tab is empty — no application form, no covering letter, no drawing — while the other three all carry documents. Residents are invited to comment on an application whose contents have not been published. Ten applications on this land are now undetermined and on Medway’s own register only three of the 54 conditions have ever been discharged: condition 5, condition 6 and condition 53. Correction, 11 September 2026: there were six applications, not four. MC/26/1723, on the Cooling Road improvements, was validated on 7 September and found by the group on 9 September; MC/26/1719, on the travel plan, was validated on 7 September and found on 11 September. That made twelve undetermined applications on this land, not ten.

Read the source: Four more applications, one of them with no documents (opens in a new tab)

A high voltage line crosses the new pitches and the drawing does not show it

The applicant’s own Utilities Assessment, filed with MC/22/0254 in February 2022 and put before the Inspector at the appeal as core document CD1-15, records a high voltage overhead line crossing the site at the location of the proposed playing fields, running from pole 712400 at the rear of ‘Rectory’ on Church Street and states that it is to be left where it is. The site plan Medway is being asked to approve under condition 41 shows no line, no pole, no easement and no clearance. The group raised the same point in its Objection Addendum of 11 October 2022, which called the presence of a 33kV overhead cable over a public sports field untenable. The appeal decision later recorded, at paragraph 63, that the existing overhead cables would be removed and redirected underground. The group filed a supplementary objection on this single ground on 8 September 2026, to be read with its objection of 7 September. It asks Medway to require a drawing plotting every overhead line and pole with its voltage against the proposed layout, to obtain UK Power Networks’ written position on the layout now proposed rather than on the illustrative one the operator commented on in August 2021 and to put the question to Sport England. Separately the group is writing to UK Power Networks direct, because the operator has never been asked about this layout and its answer is the one that matters. Neither the operating voltage nor how many lines cross the ground can be established from the documents on the council’s file. Comments on MC/26/1646 close on 24 September.

Read the supplementary objection: A high voltage line crosses the new pitches and the drawing does not show it (opens in a new tab)

The group has objected on the rec

The group filed its objection to MC/26/1646 with Medway on 7 September 2026, addressed to the case officer and copied to the Head of Development Management, the parish council and the three ward councillors. It runs to eight grounds. The central one is arithmetic. The Inspector allowed the loss of the APCM recreation ground because the replacement would be two football pitches, a cricket pitch, three tennis courts, three cricket nets and a new pavilion housing two changing rooms, which he found would go over and above what exists. The applicant’s own planning statement offers two hard tennis courts and no cricket nets. The pavilion has been designed, but that drawing sits on MC/26/1467 and forms no part of this application, so the pavilion detail condition 41 requires is not before the council at all. The group asks Medway to refuse the application, or to hold it undetermined until the missing detail, Sport England’s response and the ground condition and drainage approvals are in place. Residents can still comment in their own words until 24 September.

Read the objection: The group has objected on the rec (opens in a new tab)

A sixth application, on the rec itself

MC/26/1646 was received and validated on 28 August 2026. It asks Medway to approve the design and layout of the pitches, courts and pavilion under condition 41 of the appeal decision — the replacement for the APCM Cliffe Recreation Ground. Two documents are on the council’s file: an application form and a single site plan. Consultation opened on 3 September and closes on 24 September 2026 and as at 4 September the file recorded no public comments on it at all. It runs alongside MC/26/1467, the reserved matters for the same phase, which Medway has not yet determined.

Read the source: A sixth application, on the rec itself (opens in a new tab)

Higham Road: still no decision notice

Nine days after the committee refused MC/26/0194, Medway’s own file still shows no decision made date and no decision printed date, checked on 4 September 2026. The six-month period in which Gleeson Land can appeal runs from the date on the decision notice, not from the vote, so it has not begun. The minutes of the meeting of 26 August have not been published either, so the account of the vote on this page remains our own rather than the official record.

Read the source: Higham Road: still no decision notice (opens in a new tab)

Higham Road refused

Medway’s Planning Committee refused MC/26/0194, Gleeson Land’s application for up to 100 houses on farmland off Higham Road, on the evening of 26 August, following the officer recommendation to refuse as amended on the day. Six reasons were given — among them the permanent loss of 5.18 hectares of Grade 3a best and most versatile agricultural land and a failure to address the effects on the Thames Estuary and Marshes and Medway Estuary and Marshes Special Protection Areas. That sixth reason was not in the published report: it was added by the Supplementary Agenda Advice Sheet on the day of the meeting. Members present report that the vote was unanimous. Medway had not published the minutes as at 27 August 2026, so that is our own account of the room rather than the official record. Councillor Elizabeth Turpin addressed the committee on behalf of herself and Councillor John Williams; Councillor Michael Pearce submitted 64 pages of representations. The officer report recorded 139 letters of objection. The applicant can still appeal.

Read the source: Higham Road refused (opens in a new tab)

Committee decides Higham Road on Wednesday

Superseded by the decision on 26 August. MC/26/0194, up to 100 homes beside the Eternal Lake Nature Reserve, is Item 5 at Medway’s Planning Committee on Wednesday 26 August, 6.30pm at St George’s Centre, Chatham Maritime. Officers recommend refusal: they accept Medway cannot show a five-year housing land supply, but conclude the harm to the rural character of the area is unacceptable. The meeting is open to the public and the report is published.

Read the source: Committee decides Higham Road on Wednesday (opens in a new tab)

Formal representation filed on all five applications

The group has filed its formal representation with Medway’s Principal Planning Officer, copied to the case officer for MC/26/1459, to Natural England and to the parish council. It does not seek to reopen the principle of development. It asks Medway to decide expressly whether each of the five decisions authorises the project, or a phase of it, to proceed — and if so, to carry out and publish the habitats assessment before granting them.

Natural England replies: it is Medway’s decision

Natural England has responded twice in August. It cannot give bespoke advice to individuals and must base its consultation responses on information provided by the local planning authority. It directs concerns back to Medway, which is responsible for the final decision.

Why the drainage application matters most

The ground investigation the applicant filed says shallow soakaways into the chalk are not a viable option for disposing of surface water. Medway’s Strategic Flood Risk Assessment records that ditches across Cliffe Marshes drain into the Thames. So the practical question on MC/26/1459 is simple: where does the surface water go and does that route reach the protected wetland?

Working from

Sources and where to check