The register/MC/26/1723

Condition 12: the Cooling Road improvements

Cooling Road, Cliffe. Medway’s consultation ended 1 October 2026. It has still to decide, so a comment can still count.

The register entry

Condition 12: the Cooling Road improvements, Cooling Road, Cliffe

Awaiting a decision
Homes pre-commencementDeveloper Esquire Developments

Received and validated on 7 September 2026. Medway’s register advertises this as details of highway works to ‘town roads’, but condition 12 is about Cooling Road improvements on the eastern parcel and all four drawings filed with it are titled ‘Cooling Road — Eastern Parcel’. Condition 12 names one drawing, ITB11092-GA-022. The four drawings submitted are 5997-003-6004, 6014, 6024 and 6034. The reference ITB11092 appears on none of them. The general arrangement drawing offers the highway drainage for adoption by Kent County Council, which has had no highway function in Medway since 1998 and the connection point is marked ‘to be confirmed’. One of the four is a site clearance drawing, filed with no tree survey and no arboricultural information of any kind. The group filed its objection on 9 September 2026. Medway’s consultation period closed on 1 October 2026. On 9 October 2026 its register recorded twelve comments, all of them objections. It had not decided the application, so a comment can still count; its own target date is 2 November 2026.

  • An application advertised under a description that matches neither the condition nor the drawings
  • Trees cleared on Cooling Road with nothing filed to assess
  • Who maintains the highway drainage, on a drawing that names the wrong council

Consultation ended 1 October 2026 — still undecided

View MC/26/1723 on the portal (opens in a new tab)Read the group’s objection on MC/26/1723 (opens in a new tab)Checked 2026-10-09

Making it count

What you can do about it

Comment on MC/26/1723

Medway’s consultation period ended on 1 October 2026. It has not yet decided the application, so a comment sent now can still be taken into account.

Use the comment form on Medway’s portal, which needs a login, or email planning.representations@medway.gov.uk quoting MC/26/1723.

View MC/26/1723 on the portal (opens in a new tab)

Build your objection

The group’s objection builder has five points Medway has to answer on this application:

  • The drawings filed are not the drawing the condition names
  • The application is advertised under the wrong description
  • The drawings name an authority with no highway function here
  • Site clearance is proposed with nothing to assess it by
  • Approval would not permit development to commence

Open the builder on MC/26/1723

Pass it on

Noticeboard

What the group has said about it

Newest first. The full noticeboard is on the main page.

Six consultations close on the Church Street land

Medway’s consultation periods on MC/26/1722 and MC/26/1723 ended on 1 October 2026 and on MC/26/1719, MC/26/1720, MC/26/1721 and MC/26/1724 on 2 October 2026. On 2 October Medway’s register recorded forty-five comments across the six, all of them objections: nine on MC/26/1722, eight on MC/26/1723 and seven on each of the other four. None had been decided. Medway’s own target dates for deciding them are 2 and 3 November 2026. A comment can still count while an application is undecided. MC/26/1809, the Town Road signage under condition 13, is open until 14 October.

MC/26/1719 on Medway’s file: Six consultations close on the Church Street land (opens in a new tab)

MC/26/1646 is closed to comment

Comments on MC/26/1646, the design and layout of the pitches, courts and pavilion under condition 41, closed on 24 September 2026. Medway’s register records twenty-two comments, all of them objections, eleven of them filed in the last week before it closed. Medway has not decided it. Its own target date is 23 October 2026, which is earlier than its 2 November target for MC/26/1467, the reserved matters that fix the layout those details depend on. MC/26/1722 and MC/26/1723 are the next to close, on 1 October.

MC/26/1646 dates on Medway’s file: MC/26/1646 is closed to comment (opens in a new tab)

Closing dates set on the six new applications, one the group had missed

Medway has published consultation periods on all six applications validated on 7 and 8 September 2026. Comments on MC/26/1722 and MC/26/1723 close on 1 October 2026; on MC/26/1719, MC/26/1720, MC/26/1721 and MC/26/1724 they close on 2 October 2026. Each period runs for 21 days, which is what the group’s covering letter of 9 September asked for. One of the six had not been picked up here before. MC/26/1719 asks Medway to approve the travel plan required by condition 15; its file holds an application form and a 26-page travel plan by the consultancy DHA, marked ‘Draft’ on its cover. The group has since objected to it; see the notice above. MC/26/1721, which had nothing on its file on 9 September, now has an application form and four drawings. Twelve applications on the Church Street land are now undetermined.

Read the source: Closing dates set on the six new applications, one the group had missed (opens in a new tab)

The group objects to all five of the new applications

Five objections were filed with Medway on 9 September 2026, one to each application, with a covering letter raising what they have in common. On MC/26/1720 the air quality statement calculates nothing: it carries a figure across from January 2022, when Medway’s own guidance says the latest Defra costs should always be used and Defra has updated them twice since and it then counts against that figure electric vehicle charge points the Building Regulations require anyway. On MC/26/1721 there was nothing on the register to read at all. On MC/26/1723 the register advertises works to ‘town roads’ while the condition and every drawing say Cooling Road. On MC/26/1722 the applicant seeks to discharge a condition naming four highway works on details for one of them, on drawings that offer the drainage to Kent County Council, which has had no highway function here since 1998. On MC/26/1724 the noise report dates its own survey to 2056, still carries the letters X and Y where the temperature should be and recommends discharging two conditions nobody has applied for. The covering letter asks Medway to record on any decision notice that approval confers no right to start work of any kind, because condition 9, the construction environmental management plan, has never even been applied for and covers site clearance.

Read the covering letter: The group objects to all five of the new applications (opens in a new tab)

Four more applications, one of them with no documents

Medway validated four further applications to discharge conditions on the Church Street permission on 7 and 8 September 2026: MC/26/1720 on air quality, MC/26/1721 and MC/26/1722 on highway works and MC/26/1724 on noise. Internal target dates are 2 and 3 November. MC/26/1721 was validated on 7 September and its documents tab is empty — no application form, no covering letter, no drawing — while the other three all carry documents. Residents are invited to comment on an application whose contents have not been published. Ten applications on this land are now undetermined and on Medway’s own register only three of the 54 conditions have ever been discharged: condition 5, condition 6 and condition 53. Correction, 11 September 2026: there were six applications, not four. MC/26/1723, on the Cooling Road improvements, was validated on 7 September and found by the group on 9 September; MC/26/1719, on the travel plan, was validated on 7 September and found on 11 September. That made twelve undetermined applications on this land, not ten.

Read the source: Four more applications, one of them with no documents (opens in a new tab)

How we got here

Where it sits in the story

  1. Six more applications land in two days

    MC/26/1719 to MC/26/1724 — the travel plan, air quality, three sets of highway works and noise. Five of them are pre-commencement conditions on the appeal decision. One, MC/26/1721, went on the register with no documents at all. The group found MC/26/1723 on 9 September and MC/26/1719 on 11 September.

  2. Medway’s consultation ends on two road schemes

    The consultations on MC/26/1722, the Buttway Lane access into the new sports ground under condition 11 and MC/26/1723, the Cooling Road improvements under condition 12, end. Medway’s register recorded nine and eight comments on them on 2 October, all of them objections. Medway’s own target dates for deciding them are 3 and 2 November.

The same land

The other applications on this site

All made under MC/22/0254, the outline permission allowed on appeal in November 2023.