Condition 26: the noise assessment, Church Street, Cliffe
Awaiting a decisionReceived 7 September 2026, validated 8 September. Condition 26 requires an acoustic assessment in accordance with BS8233:2014 before each residential phase. A survey was carried out: three Class 1 meters, calibrated in the field, with a witnessed log and audio recording and the group says so plainly. The difficulty is the report. Its two tables date the survey to a period ending on 2 June 2056; the data plotted in its own appendix stop on 31 May 2026. The section describing the weather still reads ‘Temperatures ranged from X – Y °C’ and sends the reader to an appendix that holds no weather data. The only calibrator identified was laboratory-calibrated a month after the survey. No model was built for the maximum night-time levels the condition expressly limits. And the report recommends discharging conditions 27 and 28, which nobody has applied for, while elsewhere saying they should not yet be discharged — inviting Medway to accept a noise limit 10 dB above the one the Inspector imposed. The group filed its objection on 9 September 2026. Medway’s consultation period closed on 2 October 2026. On 9 October 2026 its register recorded eleven comments, all of them objections. It had not decided the application, so a comment can still count; its own target date is 3 November 2026.
- Whether new homes are protected from road noise and on what evidence
- A limit on the community hub that the report asks Medway to relax
- Whether a report that cannot be checked can discharge a condition on EIA development
Consultation ended 2 October 2026 — still undecided